How to install rolled laminate flooring
Types of Electric Radiant Heating System for Floors There are three ways to install electric heating as an underfloor heating system — via cables, mats, or film. How to Install Electric Floor Heating Under Laminate Flooring Installing electric floor heating under your laminate flooring involves six stages: Prepare the subfloor — Remove the old floor covering before you can begin the installation of the electric floor heating system. Clear the subfloor of any debris from the existing floor and then clean the area thoroughly.
Make sure that no old flooring or construction materials will remain in the area. Test the heating element — Make sure that your heating element is functioning properly by testing it using an ohmmeter. Take the measurement of the resistance of the heating element between the two core wires.
Jot this number down on the UL tag of the mat, as well as in the installation materials given to you. Compare the value to the number that is listed on the UL tag. Now measure the continuity between the ground wire and the core wire.
Install the underlayment and floor heating mats — Underlayment is usually square or rectangle pieces made of real or synthetic cork. Cut pieces as needed to make sure that you cover the entire floor.
Afterward, tape all the underlayment pieces together to connect them. Install the floor heating mats — Place the heating mat so the cold leads will reach the thermostat location easily. You should figure out in advance of the actual installation where to place the thermostat.
It usually depends on where power is available in the wall. You may have to cut the mats to fit the room, but take care not to cut the heating cables contained within them. What you can do is cut the mat material up to the cable and then bend the mat, starting a new row in the process.
Perform a third ohm-test and write the results on your warranty registration card. Make the electrical connections — Finally, you can connect the wires from the heating element to the thermostat. How to install laminate flooring on concrete subfloor. In this video, i am showing how to install laminate flooring for the first time. So that the flooring can adjust to room temperature as well as humidity. Transition strips are used to finish hardwood and laminate floor edges where the product meets an existing floor in a doorway, and are typically cut to fit and then nailed in place or snapped into a track that has been screwed to the floor.
Alternatively, you can use one of the laminate floorboards. Repeat the same process from step 2 where you roll out the row with the flap toward the sticky side of the first row and cut it off against the opposite wall.
Installing laminate flooring over wood subfloor is also possible. Click system is used for installing laminate flooring on. However, concrete has many more problems you have to tackle, like excessive moisture, which is a definite factor to concern while installing laminate flooring. Install a moisture or vapor barrier ; If your concrete passes the moisture test, then plastic sheeting at least 6 mils thick will prevent moisture from getting into your laminate flooring.
Acclimatize the laminate floorboards to the room. The steps detailed below will guide you on how to properly install laminate flooring over concrete: New concrete must be properly cured and allowed to dry for at least 60 days prior to installation. Check that the full length of the board is in contact with the floor. Best underlayment to put over wood subfloor is rubber or foam. Installing laminate on uneven concrete subflooring will make the planks lose and shorten their lifespan. Imitates the real wood, easy to install and can give your house a new look.
When you're working on a concrete floor, the installation of transitions is different from the way it's. Test-fit some laminate planks to see how they will lay out in the room. For a small- to medium-size room, it's easiest to use the flooring itself rather than measuring and calculating. Arrange planks side by side across the room. You can lock the side joints together or simply butt the planks against one another; just be careful not to walk on the flooring if the joints are not locked together.
Next, arrange a length of planks end-to-end. Be careful not to lock the planks together. This would create a lock that is difficult to undo and may damage the edges. Once you have a sense of the overall layout, pull up the planks and stack them in a nearby area. Flooring manufacturers always recommend putting down underlayment before laying the laminate.
This thin, dense foam layer helps to absorb sound, provides a thermal barrier, makes it easier to walk on the laminate, and helps the flooring bridge minor gaps and bumps in the underlying floor.
Roll out sheets of underlayment and butt the edges together so they are touching but not overlapping. Secure the seams with tape, as recommended by the manufacturer. Some underlayments come with peel-and-stick adhesive edges that are used to join the pieces. Using a utility knife, trim the underlayment to fit against the walls and obstructions.
If you are laying flooring over a concrete slab or another moisture-prone surface, the flooring manufacturer may recommend installing some type of moisture or vapor barrier to protect the flooring from moisture. Some types of underlayment are designed to serve as a moisture barrier.
Otherwise, you can install thick plastic sheeting and seal the seams with tape to provide a moisture barrier. Typically, this goes below the underlayment. Trim off the tongues not the grooves from the boards that will edge the first wall. Often, this is easy enough to do with a sharp utility knife, or you can use a table saw or circular saw. Begin laying the first row on the longest wall, with the trimmed edges of the planks against the wall.
Start on the right side and work to the left. Place spacers of scrap wood between the flooring and the wall to maintain this gap. It is always a good idea to snap a chalk line where the groove edge is going to be on the first row. Measure to the line at different points along the wall the planks will start on.
Walls are not always straight and it may be necessary to adjust the row in towards the wall or out away from the wall. Making sure to maintain the recommended gap and also checking that the re-installed base will cover the gap. It is important that the groove edge on the first row be laid on a straight line.
Proceed with additional full-length planks, working toward the left to the end of the room. As you work, lock each piece to its neighbor using a hammer and a tapping block or pull bar to snug up the joints. The end joints should be tight, with no gaps. Some manufacturers suggest tapping the planks with a rubber mallet to help close the end joints. Once you reach the left end of the first row, the last plank will likely be too long.
Measure the length needed and transfer that measurement to a full-size plank, measuring from the right to the left side, so that the tongue-end of the plank is preserved to attach to the last full plank. Be sure to account for the expansion gap at the wall. Cut the plank to length with a circular saw or jigsaw.
0コメント